Share on:

Share on LinkedIn Share on X Share on Facebook Share with email

Suggested Items

Confidee Experience Substantial Growth in Danish Space Industry

03/18/2025 | Confidee
Over the past year, Confidee has significantly strengthened its position in the Danish Space industry, achieving substantial growth in both projects and customers. 

Connect the Dots: Designing for Reality—Routing, Final Fab, and QC

03/06/2025 | Matt Stevenson -- Column: Connect the Dots
In the previous episode of I-Connect007’s On the Line with… podcast, we discussed several commonly used surface finishes, laying out the unique properties, the application process, and the associated pros and cons. Our final steps in the manufacturing process include routing, final inspection, and shipment.

RTX's Raytheon Completes 10 Subsystem Demonstrations for U.S. Army's Next-Generation Short-Range Interceptor Program

02/18/2025 | RTX
Raytheon, an RTX business, announced a series of 10 successful subsystem demonstrations for the U.S. Army's Next-Generation Short-Range Interceptor (NGSRI), which will eventually replace the Stinger® surface-to-air missile.

PCB Designers of the Future—and Their Software Tools

02/14/2025 | Andy Shaughnessy, Design007 Magazine
The PCB designers of tomorrow have their work cut out for them. They’ll be dealing with the continuing drive for “faster, smaller, cheaper,” while electronics become more complex. But EDA companies have improved their software tools’ capabilities over the past few years, incorporating functionalities such as AI and increasing productivity. I asked David Wiens, product marketing manager at Siemens, to share his thoughts on the continuing evolution of PCB design and PCB designers, and how EDA software companies can help designers meet the technological requirements of tomorrow.

Mycronic Receives Order for Prexision 8 Entry Evo

02/03/2025 | Mycronic AB
Mycronic AB has received an order for a Prexision 8 Entry Evo from an existing customer in Asia. The order value is in the range of USD 10-12 million. Delivery of the system is planned for the first quarter of 2026 and is to replace one of the customer’s older systems.
Copyright © 2025 I-Connect007 | IPC Publishing Group Inc. All rights reserved. Log in