Share on:

Share on LinkedIn Share on X Share on Facebook Share with email

Testimonial

"We’re proud to call I-Connect007 a trusted partner. Their innovative approach and industry insight made our podcast collaboration a success by connecting us with the right audience and delivering real results."

Julia McCaffrey - NCAB Group

Suggested Items

I-Connect007 Editor’s Choice: Five Must-Reads for the Week

08/28/2026 | Nolan Johnson, I-Connect007
This week, the Global Electronics Association published its monthly report on PCB fabrication and EMS bookings and shipments, and the numbers are extremely positive. In EMS, the three-month book-to-bill ratio stands at 1.29 for July. Year-to-date EMS bookings are at 11% over 2025. The picture is similar in PCB fabrication as well. Year-to-date bookings are up 33% over last year, and book-to-bill stands at 1.46.

Road to Reliability: Failures, Monitoring, and Standards on the Path to EV Reliability

08/27/2026 | Stanton Rak, SF Rak Company
Throughout this series, we have examined the technologies, materials, architectures, and environmental challenges that influence the reliability of EV electronics. Yet reliability is ultimately judged in only one place: the field. Customers do not experience qualification reports, design reviews, or accelerated test results. They experience vehicles that either perform as expected or do not. As EV adoption expands globally, the industry has accumulated a growing body of field experience. These lessons reveal both the strengths of current designs and the areas where improvement remains necessary.

Elementary, Mr. Watson: PCB Design Is a Team Sport (Revisited)

08/27/2026 | John Watson -- Column: Elementary, Mr. Watson
At the Tokyo 2020 Olympics, the U.S. men’s 4x100-meter relay team of Trayvon Bromell, Fred Kerley, Ronnie Baker, and Cravon Gillespie was expected to contend for gold. With some of the fastest sprinters in the world, simply reaching the final seemed almost certain. Instead, the heavily favored team finished sixth in its qualifying heat and failed to advance, missing the final by just two-hundredths of a second. This massive disappointment was not due to a lack of individual speed but to a poorly executed baton exchange between Kerley and Baker, which forced both runners to slow down at the most critical moment.

I-Connect007 Editor’s Choice: Five Must-Reads for the Week

08/21/2026 | Michelle Te, I-Connect007
Some situations came up for me this week (delayed flights and malfunctioning work software) that highlighted how much we rely on tools every day. When they’re working, we barely think about them. When they’re not, we’re suddenly reminded of everything else that has to be in place for the work to get done: good processes, knowledgeable people, communication, teamwork, and sometimes ingenuity. I’ve observed that engineers aren’t any different in their work.

Follow the Story: The Business of Engineering

08/19/2026 | I-Connect007
Building great products requires great engineering, but building a successful engineering company requires something more. Leaders must make decisions about investments, acquisitions, workforce development, automation, sourcing, strategy, and innovation, all while navigating changing markets and emerging technologies. This collection of articles and columns explores the business side of technical leadership, by gathering perspectives from executives, engineers, entrepreneurs, and industry experts who understand that long-term success depends on more than technical excellence.
Copyright © I-Connect007 | IPC Publishing Group Inc. All rights reserved. Log in