Share on:

Share on LinkedIn Share on X Share on Facebook Share with email

Testimonial

"Our marketing partnership with I-Connect007 is already delivering. Just a day after our press release went live, we received a direct inquiry about our updated products!"

Rachael Temple - Alltemated

Suggested Items

Incap Germany Reflects on a Successful 20th Connector User Congress

07/09/2026 | Incap
The established industry event brought together the connector community for three days of in-depth discussion on current developments, technical challenges and practical solutions in modern interconnect technology.

Curtiss-Wright Announces $80M Investment to Expand Pennsylvania Operations

07/08/2026 | BUSINESS WIRE
Curtiss-Wright Corporation announced an $80 million, multi-year investment to expand operations at its Cheswick, Pennsylvania facility, part of the Company’s Naval & Power segment, through a combination of internal capital investments, state support and maritime industrial base funding via the U.S. Department of War budget.

Amphenol Trackwise Announces Record-Breaking 100-Metre Multi-Layer Flexible Circuit for Industrial Customer

07/08/2026 | Trackwise
Amphenol Trackwise Designs, a global leader in the design and manufacture of advanced flexible printed circuit boards (PCBs), has announced the successful manufacture of a 100-metre-long multi-layer flexible circuit.

How Faster Changeovers Unlock Production Capacity

07/08/2026 | Nolan Johnson, SMT007 Magazine
Traditionally, EMS companies have focused their continuous improvement efforts on machine speeds, placement accuracy, yield enhancement, and labor productivity. Yet across much of the industry, one of the largest contributors to lost capacity remains largely hidden in plain sight. We’re talking, of course, about setup time optimization. High-mix production is increasing even as product lifecycles shrink, meaning changeovers occur more frequently than ever, resulting in a proportionally larger amount of time lost to setup activities. Inefficient setup processes cost hundreds of hours of annual production capacity, and this lost time can mean the difference between a modest profit and self-funded company expansion.

Micron Begins Construction of Cleanroom at Hiroshima Plant to Support Advanced Memory for AI Applications

07/07/2026 | Micron
Micron Technology, Inc. today announced the commencement of construction on a new cleanroom at its Hiroshima plant in Higashihiroshima, Hiroshima Prefecture.
Copyright © I-Connect007 | IPC Publishing Group Inc. All rights reserved. Log in