Share on:

Share on LinkedIn Share on X Share on Facebook Share with email

Testimonial

"We’re proud to call I-Connect007 a trusted partner. Their innovative approach and industry insight made our podcast collaboration a success by connecting us with the right audience and delivering real results."

Julia McCaffrey - NCAB Group

Suggested Items

Kingboard Raises $1.5 Billion Through Kingboard Laminates Stake Sale to Support PCB Expansion

06/17/2026 | I-Connect007 Editorial Team
Kingboard Holdings has raised approximately HK$11.77 billion (US$1.5 billion) through the sale of a portion of its stake in subsidiary Kingboard Laminates Holdings, as growing demand from AI infrastructure drives investment across the PCB and electronics materials supply chain.

NUBURU Defense Unveils Italian Plan, Strengthens Strategic Team

06/17/2026 | BUSINESS WIRE
The plan is expected to be supported by senior strategic advisers Prof. Carlo Alberto Carnevale Maffè and Gen. Pietro Serino.

TSMC Accelerates CoPoS Development; Taiwan Suppliers Leverage FOPLP for Glass Core Substrates

06/17/2026 | TrendForce
The rapid growth of demand for AI semiconductors is driving the evolution of advanced packaging technologies, with Fan-Out Panel-Level Packaging (FOPLP) emerging as a new battleground across the industry.

A.R.T. Supports IPC/WHMA-A-620 Revision F with Updated Training Materials

06/16/2026 | A.R.T. Ltd.
Advanced Rework Technology Ltd. (A.R.T. Ltd.), a leading provider of IPC-certified training and an IPC-authorized distributor, is supporting the transition to IPC/WHMA-A-620 Revision F with updated training materials for cable and wire harness assembly.

Getters for Hermetic Packages: Mechanisms, Reliability Impact, and MacDermid Alpha Electronics Solutions

06/11/2026 | Michael Previti, MacDermid Alpha Electronics Solutions
Hermetic packages protect chips, lasers, and sensors from the outside world, but the cavity inside can still change after seal. Small amounts of water, hydrogen, carbon dioxide, and organic vapor may remain after build or may form later from adhesives, films, and other internal materials. Getters reduce that risk by creating a planned sink for those gases inside the package. When teams choose the right getter early, they hold the headspace steady, cut reliability escapes, and lower the life-cycle cost of a high-value device.
Copyright © I-Connect007 | IPC Publishing Group Inc. All rights reserved. Log in