Hubble’s Advanced Camera for Surveys Instrument Resumes Science, Investigation Continues
November 9, 2021 | NASAEstimated reading time: 2 minutes

NASA is continuing work to resolve an issue that has suspended science operations on the Hubble Space Telescope. The science instruments entered a safe mode configuration on Oct. 25 after detecting a loss of specific data synchronization messages.
The Hubble team is focusing its efforts to isolate the problem on hardware that commands the instruments and is part of the Science Instrument Command and Data Handling Unit. Specifically, the team is analyzing the circuitry of the Control Unit, which generates synchronization messages and passes them onto the instruments.
While analyzing the Control Unit, the team is working to identify potential workarounds for the issue. These include possible changes to instrument flight software that could check for these lost messages and compensate for them without putting the instruments into safe mode. These workarounds would first be verified using ground simulators to ensure they work as planned.
Over the weekend of Oct. 30, the team prepared to turn on parts of the Near Infrared Camera and Multi Object Spectrometer (NICMOS) instrument to collect data on this issue, allowing the team to determine how frequently this problem occurs. Installed in 1997, NICMOS has been inactive since 2010, when the Wide Field Camera 3 became operational. NICMOS allowed the team to use an instrument to collect information on these lost messages while keeping the active instruments off as a safety precaution. Since NICMOS was recovered on Nov. 1, no additional synchronization messages have been lost.
The team is now taking steps to recover Hubble’s Advanced Camera for Surveys (ACS) instrument from safe mode and start collecting science with that instrument at the beginning of next week. The team will make the decision on Sunday after analyzing the latest data. If a lost message is seen before then, the decision to activate ACS will also be revisited. The team is proceeding cautiously to ensure the safety of the instruments and avoid additional stresses on the hardware. Therefore, only ACS will be used in this capacity next week. ACS was selected as the first instrument to recover as it faces the fewest complications should a lost message occur.
Over the next week, the team will continue analyzing the Control Unit design diagrams and data associated with the lost messages to determine what may have caused this problem. They will also be looking into potential instrument software changes that could help address it. Once the team better understands the frequency of the problem and has determined the time needed to implement possible software changes, they will discuss a plan for returning the other instruments to science operations.
Testimonial
"In a year when every marketing dollar mattered, I chose to keep I-Connect007 in our 2025 plan. Their commitment to high-quality, insightful content aligns with Koh Young’s values and helps readers navigate a changing industry. "
Brent Fischthal - Koh YoungSuggested Items
Teledyne FLIR Defense Opens New Office in Arlington, Virginia
09/18/2025 | BUSINESS WIRETeledyne FLIR Defense, part of Teledyne Technologies Incorporated, held an opening event yesterday for its new office in the Crystal City area of Arlington, Virginia, minutes from the Pentagon.
Nortech Systems Achieves Enhanced Fiber Optic Performance
09/16/2025 | Nortech SystemsNortech Systems Incorporated, a leading provider of design and manufacturing solutions for complex electromedical devices and electromechanical systems, announced significant advancements in its fiber optic capabilities.
Altair, Wichita State University’s NIAR Sign MoU to Accelerate Aerospace Innovation
09/16/2025 | AltairAltair, a global leader in computational intelligence, and Wichita State University’s (WSU) National Institute for Aviation Research (NIAR), one of the world’s leading aerospace research institutions, have signed a memorandum of understanding (MoU) to advance innovation across the aerospace and defense industries.
India’s Aerospace and Defence Engineered for Power, Driven by Electronics
09/16/2025 | Gaurab Majumdar, Global Electronics AssociationWith a defence budget of $82.05 billion (2025–26) and a massive $223 billion earmarked for aerospace and defence spending over the next decade, India is rapidly positioning itself as a major player in the global defence and aerospace market.
U.S. Army Awards $13M IDIQ Contract to Element U.S. Space & Defense
09/11/2025 | BUSINESS WIREElement U.S. Space & Defense, a trusted leader in advanced testing and engineering services, has been awarded a multi-year indefinite-delivery/indefinite-quantity (IDIQ) contract valued at $13,021,816 from United States Army Contracting Command - Aberdeen Proving Ground (ACC-APG).