-
- News
- Books
Featured Books
- smt007 Magazine
Latest Issues
Current IssueIntelligent Test and Inspection
Are you ready to explore the cutting-edge advancements shaping the electronics manufacturing industry? The May 2025 issue of SMT007 Magazine is packed with insights, innovations, and expert perspectives that you won’t want to miss.
Do You Have X-ray Vision?
Has X-ray’s time finally come in electronics manufacturing? Join us in this issue of SMT007 Magazine, where we answer this question and others to bring more efficiency to your bottom line.
IPC APEX EXPO 2025: A Preview
It’s that time again. If you’re going to Anaheim for IPC APEX EXPO 2025, we’ll see you there. In the meantime, consider this issue of SMT007 Magazine to be your golden ticket to planning the show.
- Articles
- Columns
Search Console
- Links
- Media kit
||| MENU - smt007 Magazine
RTX's Raytheon Awarded $333M Contract for SM-6 Block IA Production
January 15, 2025 | RTXEstimated reading time: 1 minute
Raytheon, an business, was awarded a $333 million contract from the U.S. Navy to produce Standard Missile-6 (SM-6) Block IA missiles.
"SM-6 has a proven performance, and this contract is an important step for providing this urgently needed weapon to our armed forces," said Barbara Borgonovi, president of Naval Power at Raytheon. "Raytheon continues to work closely with our customers to ensure our military has an unfair advantage at sea and to keep our adversaries guessing."
Deployed on U.S. Navy ships, SM-6 delivers a proven, over-the-horizon offensive and defensive capability by leveraging the time-tested Standard Missile airframe and propulsion system. It's the only missile that supports anti-air and anti-surface warfare and sea-based terminal ballistic missile defense in one solution, enabling the U.S. and its allies to cost-effectively increase the offensive might of surface forces.
SM-6 has been successfully fired from various U.S. Navy ships, unmanned vessels, and launchers on land. In March 2024, SM-6 demonstrated its anti-missile capabilities by successfully intercepting a medium-range ballistic missile target at sea during the Flight Test Aegis Weapon System (FTM)-32 exercise.
Production under this contract will be completed at Raytheon facilities in Tucson, Ariz., Huntsville, Ala., Andover, Mass., and Dine, N.M. with expected completion by 2027.
Suggested Items
BAE Systems Selected to Enhance Ground System for Space Force Missile Warning Satellites
04/29/2025 | BAE SystemsBAE Systems has been selected by U.S. Space Force Space Systems Command to provide a new satellite command and control (C2) system for its Future Operationally Resilient Ground Evolution (FORGE) program.
RTX's Lower Tier Air and Missile Defense Sensor Positioned for Production
04/21/2025 | RTXRaytheon, an RTX business, is transitioning to production of its Lower Tier Air and Missile Defense Sensor, or LTAMDS, after completing the U.S. Army's rigorous flight test program and achieving the Department of Defense's Major Capability Acquisition Milestone C designation.
L3Harris Expands Indiana Facility to Support America’s Golden Dome
04/18/2025 | L3Harris TechnologiesL3Harris Technologies has completed a $125 million expansion at its space manufacturing facility in Fort Wayne to support the Department of Defense’s urgent need for on-orbit technology to defend the homeland by building a “Golden Dome” around the United States.
Roke Secures Long-Term UK Missile Defence Centre Science and Technology Framework Contract
04/07/2025 | RokeRoke has been awarded a major multi-year contract known as Science & Technology Oriented Research & development in Missile defence (STORM), partnering with the UK Missile Defence Centre (MDC) to deliver cutting-edge research for Missile Defence.
Saab Receives Order for TAURUS KEPD 350 Sub-components
03/04/2025 | SaabSaab has received an order for maintenance and modernisation of the cruise missile TAURUS KEPD 350. The order value is SEK 1.7 billion and the contract period is 2025-2035.